Teardrop Trail Log: September 20, 2016
After the unfortunate incident with the solar panel on our way to the Red Power Roundup, we were able to use shore power for the remainder of the trip. Disappointing, but not a show stopper. We had already determined that a single 100-watt panel was not enough for our needs, so I was planning an upgrade anyway. With a trip planned in late September, it was time to act. I ordered two new 100-watt panels, MC4 combiner connectors and additional MC4 crimp-on connectors. This would double our previous power capacity and allow for daytime use of a couple of small appliances including a crock-pot and solid-state cooler.
Analysis of the incident and the remaining parts of the old panel made it clear that wind entering the leading edge had repeatedly flexed the panel causing it to fatigue and ultimately fail. It seemed to me that sealing the leading edge to the teardrop roof with a rigid mount would prevent this type of failure in the future. A trip to Home Depot secured an aluminum strip, and by drilling holes that matched the existing screw mounts, I could seal the leading panel to the teardrop skin. The leading panel then overlapped the other panel so it was also sealed to the wind.
Once installed, the panels began producing power immediately. Although we currently only have about 80 Amp-hours of storage, the two panels can easily replace the day’s power use with 10 to 12 amp output in full sun. Also, by adding a 300-watt inverter, we are able to run a 1 1/2 quart crock pot during the day with power to spare. The next upgrade will be a larger battery.
The Ambassador was ready for a trip to Bob Sandlin State Park.
Pingback: Solar Powered Rainwater Project | Roy Creek Ranch
Pingback: Solar Chili | Teardrop Trail